Hydro HYD02 ● ONLINE

Hydro Station 02

Stable run-of-river generation schedule

Installed Capacity 120.0 MW
Active Output
49.6 MW
Live Telemetry
Availability
96.5 %
Rolling 30 Days
Capacity Factor
82.6 %
Yield vs Nameplate
Asset Health
91 /100
Condition Index
Energy Today
582 MWh
Cumulative Dispatch

Interactive Digital Twin Telemetry Mimic

HYD02

Dynamic physics animation driven by live SCADA instrumentation

Telemetry Synchronized
WATER FLOW RATE 142.5 m³/s

Hydro Specialized Diagnostic Telemetry

Real-time FTDM Process & Equipment Instrumentation

12 Tags Tracked
Active Power Generation
49.6 MW
Real power output
Energy Today Generation
582.0 MWh
Cumulative daily generation
Availability Factor Performance
96.5 %
Operating availability factor
Capacity Factor Performance
82.6 %
Generation vs nameplate capacity
Asset Health Index Reliability
92 Score
Composite health indicator 0-100
Penstock Water Flow Resource
148.0 m³/s
Inflow volumetric flow rate
Reservoir Level Resource
114.2 m
Headpond water elevation
Effective Head Process
94.0 m
Net hydraulic head
Turbine Rotor Speed Equipment
300.0 RPM
Francis/Pelton rotational speed
Turbine Efficiency Performance
91.5 %
Hydrodynamic conversion efficiency
Generator Health Reliability
93 %
Stator/rotor thermal condition
Shaft Vibration Reliability
2.4 mm/s
Peak vibration velocity

Plant Units & Sub-Systems (2)

HYD02-U1

Hydro Block 1

● ONLINE

Capacity: 60.0 MW

Active Power 49.6 MW
Energy Today 582.0 MWh
HYD02-U2

Hydro Block 2

● ONLINE

Capacity: 60.0 MW

Active Power 48.2 MW
Energy Today 565.4 MWh