GENiX
Enterprise Renewable
Fleet Intelligence
Hydro · Solar · Geothermal · Wind · Gas · Battery
Battery Storage BES02 ● ONLINE

Battery Station 02

Charging 20.0 MW from adjacent solar excess

Installed Capacity 50.0 MW
Active Output
-20.0 MW
Live Telemetry
Availability
99.8 %
Rolling 30 Days
Capacity Factor
40.0 %
Yield vs Nameplate
Asset Health
99 /100
Condition Index
Energy Today
88 MWh
Cumulative Dispatch

Interactive Digital Twin Telemetry Mimic

BES02

Dynamic physics animation driven by live SCADA instrumentation

Telemetry Synchronized
STATE OF CHARGE (SOC) 84.2%

Battery Storage Specialized Diagnostic Telemetry

Real-time FTDM Process & Equipment Instrumentation

12 Tags Tracked
Active Power Generation
-20.0 MW
Real power output
Energy Today Generation
88.0 MWh
Cumulative daily generation
Availability Factor Performance
99.8 %
Operating availability factor
Capacity Factor Performance
40.0 %
Generation vs nameplate capacity
Asset Health Index Reliability
99 Score
Composite health indicator 0-100
State of Charge (SOC) Storage
58.0 %
Usable energy percentage stored
State of Health (SOH) Storage
99.6 %
Remaining battery capacity retention
Charge Power Rate Storage
20.0 MW
Current active charging intake
Discharge Power Rate Storage
0.0 MW
Current active grid supply
Mean Cell Temperature Storage
23.4 °C
HVAC pack average cell temp
Equivalent Full Cycles Storage
85 Cycles
Cumulative charge-discharge cycles
Round-Trip Efficiency Performance
89.2 %
AC-to-AC round-trip efficiency

Plant Units & Sub-Systems (1)

BES02-P1

BESS Enclosure Beta (4-hr)

● ONLINE

Capacity: 50.0 MW

Active Power -20.0 MW
Energy Today 88.0 MWh