GENiX
Enterprise Renewable
Fleet Intelligence
Hydro · Solar · Geothermal · Wind · Gas · Battery

Fleet Operations Room

Real-Time Operational Dispatch, Reserve Margins & Grid Interconnection

Frequency 50.02 Hz Stable
Total Generation Dispatch
1270.9 MW
Scheduled Target: 1,020 MW
Transmission Grid Demand
980 MW
Net Balance: +290.9 MW Export
Spinning Reserve Capacity
644 MW
Fast Peaking Gas Ready
Storage Grid Support
+15.0 MW
BES01 Discharging / BES02 Soak
CRITICAL DISPATCH WARNING: WND03 Generator Bearing Exceeding Thermal Threshold

Generator drive-end bearing at 86.4°C (Limit: 80.0°C). Vibration amplitude at 4.2 mm/s.

Inspect WND03

Active Fleet Units Status (17 Sites)

13 Online • 2 Watch • 1 Alert
Site Sector Capacity (MW) Current Output (MW) Status Diagnostic Summary Action
HYD01 Hydro 180 147.2 ● ONLINE Optimal hydraulic reservoir head and river inflow Inspect →
HYD02 Hydro 120 97.8 ● ONLINE Stable run-of-river generation schedule Inspect →
HYD03 Hydro 90 69.0 ● WARNING Shaft vibration alert on Unit 1 (3.8 mm/s threshold exceeded) Inspect →
SOL01 Solar 150 135.6 ● ONLINE High irradiance GHI > 920 W/m², tracking optimal Inspect →
SOL02 Solar 100 42.1 ● WARNING Transient cloud front passing; production dropped 46% Inspect →
SOL03 Solar 80 71.5 ● ONLINE Normal clear-sky tracking production Inspect →
SOL04 Solar 60 0.0 ● MAINTENANCE Scheduled preventive maintenance on Inverter Station 3 Inspect →
GEO01 Geothermal 75 71.4 ● ONLINE Continuous baseload dispatch at 95% capacity factor Inspect →
GEO02 Geothermal 55 50.8 ● ONLINE Wellhead enthalpy stable, minor silica scaling mitigation active Inspect →
GEO03 Geothermal 45 41.8 ● ONLINE Clean steam separators in service, zero venting Inspect →
WND01 Wind 200 167.8 ● ONLINE High ridge wind corridor at 11.8 m/s, pitch regulated Inspect →
WND02 Wind 160 134.2 ● ONLINE Plateau breeze steady at 10.4 m/s Inspect →
WND03 Wind 120 81.5 ● CRITICAL Generator drive-end bearing temperature 86.4°C (high vibration 4.2 mm/s) Inspect →
WND04 Wind 80 65.2 ● ONLINE New generation direct-drive turbines fully operational Inspect →
GAS01 Flexible Gas 250 95.0 ● ONLINE Peaking fast-start dispatch active to balance cloud front ramp Inspect →
BES01 Battery Storage 100 35.0 ● ONLINE Discharging 35.0 MW to support regional evening demand crest Inspect →
BES02 Battery Storage 50 -20.0 ● ONLINE Charging 20.0 MW from adjacent solar excess Inspect →