Fleet Operations Room
Real-Time Operational Dispatch, Reserve Margins & Grid Interconnection
Frequency 50.02 Hz Stable
Total Generation Dispatch
1270.9
MW
Scheduled Target: 1,020 MW
Transmission Grid Demand
980
MW
Net Balance: +290.9 MW Export
Spinning Reserve Capacity
644
MW
Fast Peaking Gas Ready
Storage Grid Support
+15.0
MW
BES01 Discharging / BES02 Soak
CRITICAL DISPATCH WARNING: WND03 Generator Bearing Exceeding Thermal Threshold
Generator drive-end bearing at 86.4°C (Limit: 80.0°C). Vibration amplitude at 4.2 mm/s.
Active Fleet Units Status (17 Sites)
13 Online • 2 Watch • 1 Alert| Site | Sector | Capacity (MW) | Current Output (MW) | Status | Diagnostic Summary | Action |
|---|---|---|---|---|---|---|
| HYD01 | Hydro | 180 | 147.2 | ● ONLINE | Optimal hydraulic reservoir head and river inflow | Inspect → |
| HYD02 | Hydro | 120 | 97.8 | ● ONLINE | Stable run-of-river generation schedule | Inspect → |
| HYD03 | Hydro | 90 | 69.0 | ● WARNING | Shaft vibration alert on Unit 1 (3.8 mm/s threshold exceeded) | Inspect → |
| SOL01 | Solar | 150 | 135.6 | ● ONLINE | High irradiance GHI > 920 W/m², tracking optimal | Inspect → |
| SOL02 | Solar | 100 | 42.1 | ● WARNING | Transient cloud front passing; production dropped 46% | Inspect → |
| SOL03 | Solar | 80 | 71.5 | ● ONLINE | Normal clear-sky tracking production | Inspect → |
| SOL04 | Solar | 60 | 0.0 | ● MAINTENANCE | Scheduled preventive maintenance on Inverter Station 3 | Inspect → |
| GEO01 | Geothermal | 75 | 71.4 | ● ONLINE | Continuous baseload dispatch at 95% capacity factor | Inspect → |
| GEO02 | Geothermal | 55 | 50.8 | ● ONLINE | Wellhead enthalpy stable, minor silica scaling mitigation active | Inspect → |
| GEO03 | Geothermal | 45 | 41.8 | ● ONLINE | Clean steam separators in service, zero venting | Inspect → |
| WND01 | Wind | 200 | 167.8 | ● ONLINE | High ridge wind corridor at 11.8 m/s, pitch regulated | Inspect → |
| WND02 | Wind | 160 | 134.2 | ● ONLINE | Plateau breeze steady at 10.4 m/s | Inspect → |
| WND03 | Wind | 120 | 81.5 | ● CRITICAL | Generator drive-end bearing temperature 86.4°C (high vibration 4.2 mm/s) | Inspect → |
| WND04 | Wind | 80 | 65.2 | ● ONLINE | New generation direct-drive turbines fully operational | Inspect → |
| GAS01 | Flexible Gas | 250 | 95.0 | ● ONLINE | Peaking fast-start dispatch active to balance cloud front ramp | Inspect → |
| BES01 | Battery Storage | 100 | 35.0 | ● ONLINE | Discharging 35.0 MW to support regional evening demand crest | Inspect → |
| BES02 | Battery Storage | 50 | -20.0 | ● ONLINE | Charging 20.0 MW from adjacent solar excess | Inspect → |
Atlas AI Copilot
GENIX Intelligent Energy Copilot
Quick:
Welcome to Atlas AI Copilot.
I have real-time FTDM telemetry for all 17 sites across Hydro, Solar, Geothermal, Wind, Gas, and Battery Storage. Ask me any operational, forecast, or risk question.
Integrated with FactoryTalk DataMosaix & Gemini
Press Enter to send