Hydro HYD01 ● ONLINE

Hydro Station 01

Optimal hydraulic reservoir head and river inflow

Installed Capacity 180.0 MW
Active Output
74.8 MW
Live Telemetry
Availability
98.4 %
Rolling 30 Days
Capacity Factor
83.1 %
Yield vs Nameplate
Asset Health
94 /100
Condition Index
Energy Today
892 MWh
Cumulative Dispatch

Interactive Digital Twin Telemetry Mimic

HYD01

Dynamic physics animation driven by live SCADA instrumentation

Telemetry Synchronized
WATER FLOW RATE 142.5 m³/s

Hydro Specialized Diagnostic Telemetry

Real-time FTDM Process & Equipment Instrumentation

12 Tags Tracked
Active Power Generation
74.8 MW
Real power output
Energy Today Generation
892.4 MWh
Cumulative daily generation
Availability Factor Performance
98.4 %
Operating availability factor
Capacity Factor Performance
83.1 %
Generation vs nameplate capacity
Asset Health Index Reliability
95 Score
Composite health indicator 0-100
Penstock Water Flow Resource
214.2 m³/s
Inflow volumetric flow rate
Reservoir Level Resource
168.5 m
Headpond water elevation
Effective Head Process
122.0 m
Net hydraulic head
Turbine Rotor Speed Equipment
250.0 RPM
Francis/Pelton rotational speed
Turbine Efficiency Performance
93.4 %
Hydrodynamic conversion efficiency
Generator Health Reliability
96 %
Stator/rotor thermal condition
Shaft Vibration Reliability
1.8 mm/s
Peak vibration velocity

Plant Units & Sub-Systems (2)

HYD01-U1

Turbine Unit 1

● ONLINE

Capacity: 90.0 MW

Active Power 74.8 MW
Energy Today 892.4 MWh
HYD01-U2

Turbine Unit 2

● ONLINE

Capacity: 90.0 MW

Active Power 72.4 MW
Energy Today 864.1 MWh

Active Events & Alarms for HYD01

1 Events Logged
INFO Hydro Inflow Optimization (08:30)

Reservoir head elevation at 168.5 m (+0.4m over 24h). Turbine efficiency increased to 93.4%.