Installed Capacity
180.0 MW
Active Output
74.8
MW
Live Telemetry
Availability
98.4
%
Rolling 30 Days
Capacity Factor
83.1
%
Yield vs Nameplate
Asset Health
94
/100
Condition Index
Energy Today
892
MWh
Cumulative Dispatch
Interactive Digital Twin Telemetry Mimic
HYD01Dynamic physics animation driven by live SCADA instrumentation
Telemetry Synchronized
Hydro Specialized Diagnostic Telemetry
Real-time FTDM Process & Equipment Instrumentation
Active Power
Generation
74.8
MW
Real power output
Energy Today
Generation
892.4
MWh
Cumulative daily generation
Availability Factor
Performance
98.4
%
Operating availability factor
Capacity Factor
Performance
83.1
%
Generation vs nameplate capacity
Asset Health Index
Reliability
95
Score
Composite health indicator 0-100
Penstock Water Flow
Resource
214.2
m³/s
Inflow volumetric flow rate
Reservoir Level
Resource
168.5
m
Headpond water elevation
Effective Head
Process
122.0
m
Net hydraulic head
Turbine Rotor Speed
Equipment
250.0
RPM
Francis/Pelton rotational speed
Turbine Efficiency
Performance
93.4
%
Hydrodynamic conversion efficiency
Generator Health
Reliability
96
%
Stator/rotor thermal condition
Shaft Vibration
Reliability
1.8
mm/s
Peak vibration velocity
Plant Units & Sub-Systems (2)
HYD01-U1
● ONLINE
Turbine Unit 1
Capacity: 90.0 MW
Active Power
74.8 MW
Energy Today
892.4 MWh
HYD01-U2
● ONLINE
Turbine Unit 2
Capacity: 90.0 MW
Active Power
72.4 MW
Energy Today
864.1 MWh
Active Events & Alarms for HYD01
INFO
Hydro Inflow Optimization
(08:30)
Reservoir head elevation at 168.5 m (+0.4m over 24h). Turbine efficiency increased to 93.4%.
Atlas AI Copilot
GENIX Intelligent Energy Copilot
Quick:
Welcome to Atlas AI Copilot.
I have real-time FTDM telemetry for all 17 sites across Hydro, Solar, Geothermal, Wind, Gas, and Battery Storage. Ask me any operational, forecast, or risk question.
Integrated with FactoryTalk DataMosaix & Gemini
Press Enter to send