WINDIX SaaS
Wind Farm SCADA
โ๏ธ Fleet Efficiency & Performance
โก Fleet Power Output
๐ญ Farm Power Comparison
๐ฌ๏ธ Wind Speed Trend
Analytical View
Deep dive into performance metrics across all arrays
Wake Effect Analysis (Coefficient vs Wind Direction)
Power Curve Deviation
- T014 (Baltic) -4.2%
- T005 (North Sea) -2.8%
- T022 (Coastal) -0.5%
Historical Availability Map
| Farm | MTBF (hrs) | MTTR (hrs) | Overall Availability |
|---|---|---|---|
| North Sea Array | 4,250 | 4.2 | 98.4% |
| Baltic Offshore | 3,890 | 6.1 | 96.2% |
| Coastal Array | 5,100 | 3.8 | 99.1% |
Executive Dashboard
High-level business overview and portfolio performance
Revenue vs Forecast (Monthly)
Asset Performance Snapshot
Maintenance AI FTDM Neural Engine
Predictive analytics and remaining useful life (RUL) estimation
T014 Main Bearing
92% ProbAcoustic anomaly detected. Signature matches inner race spalling. Est time to failure: 14 days.
T005 Pitch Motor B
78% ProbIncreased current draw during high-wind pitch operations. Possible lubrication failure.
Remaining Useful Life (RUL) - Critical Components
๐ค FTDM AI Recommendation
Batch maintenance order recommended for Baltic Offshore Array. Combining gearbox inspection on T014 with scheduled lubrication on T015-T020 will save an estimated $42,000 in vessel mobilization costs.
Grid Integration
Real-time substation and grid compliance metrics
Grid Module Active
Voltage control, reactive power limits, and curtailment signals are currently operating within transmission system operator (TSO) compliance limits.
Alarm & Events
System notifications and SCADA alerts
| Severity | Time | Source | Description | Action |
|---|---|---|---|---|
| CRITICAL | 10:42:15 | T014 | Main bearing vibration exceeds threshold (0.045g) | |
| WARNING | 09:15:00 | Substation Alpha | Transformer cooling pump B flow rate low | |
| INFO | 08:00:00 | System | Daily automated reporting generated successfully | Cleared |
ESG & Reporting
Environmental impact and sustainability metrics
Sustainability Overview
Your wind portfolio has offset 42,800 tonnes of CO2 this year, equivalent to planting 1.5 million trees.
Financial Forecast & Market Analytics
Revenue projections based on PPA settlements and day-ahead spot market prices